Description
STILL TIME TO CUSTOMIZE BUILDING AND SITE LAYOUT!
This site was previously approved for 2 industrial use buildings. Informal preliminary review with Andover Township for 600,000 SF Warehouse received favorable feedback.
DEP L.O.I. application and review of wetlands was previously approved.
Site has been cleared, graded and prepared for building construction. Existing 52,000 SF steel building constructed in 2020 stands 90% completed. Conceptual design includes a new single building up to 500,000 SF, removal or relocation of existing steel building required. Built-to-suit options available for various sizes and configurations. Rail spur/extension from existing rail line along northeast property line, optional.
ALL NLD PROJECTS ARE COMMISSIONABLE